News

Learn more about our completed projects and the latest news!
References

Simetek manufactured overflow troughs for a mine

29.12.2023

We built overflow troughs for a mine to capture the overflow from froth flotation. 🪨 Because the troughs must withstand abrasion, we chose to use chromium carbide. 💥